|
Base Drawer Cabinets
A 'Base Drawer Cabinet' comes complete with all screws and hardware required to assemble the cabinet.
Note: In your order you will find the paperwork on your job, and in there is a detailed Assembly Instruction sheet, which explains 'which screw attaches to what and how many'.
Assembly process:
1. Attach the Leg Bases to the bottom of the Cabinet. Click the button below to show you how it's done:
2. Attach the Drawer Slides to the Ends (Gables). Click the button below to show you how it's done:
4. Join the Bottom (base) to a cabinet End (also known as a 'Gable'). Use the correct screw as identified in the detailed Assembly Instruction sheet (normally a 50mm screw). The joints are all butt joined, as the screws act as a steel dowel to secure the pieces together.
Note: A machined location hole is drilled into the bottom front section of the End itself, and this is to identify the bottom of the End Front.
TIP: Make sure that when fixing the End to the Bottom, that this hole is at the bottom.
![](https://quotes.OzFlatPacks.com.au/site-images/wc/a-graphics/assembly.base.drawer.cabinet.5.gif)
5. Join the remaining End (Gable) to the Bottom (Base) of the Cabinet.
Note: The image below has a sink bowl cut out in it, as this was a special request from the customer; yours will not have this.
![](https://quotes.OzFlatPacks.com.au/site-images/wc/a-graphics/assembly.base.drawer.cabinet.9.gif)
![](https://quotes.OzFlatPacks.com.au/site-images/wc/a-graphics/assembly.base.drawer.cabinet.11.gif)
![](https://quotes.OzFlatPacks.com.au/site-images/wc/a-graphics/assembly.base.drawer.cabinet.12.gif)
We hope that this information has been helpful for you.
If you need further help or more information on this topic please:
|